You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Tegal Alur Sudah Mencapai 70 Persen

Process of Tegal Alur Retention Basin Construction Reaches 70 Percent

Tegal Alur Retention Basin construction in Kalideres, West Jakarta has reached 70 percent.

This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood

West Jakarta Water Resources (SDA) Sub-agency's Flood Control Maintenance System for Clean Water and Wastewater Section Head, Wawan conveyed, this retention basin is as wide as 2,410 square meters and depth of 3 meters on 3,640 square meters land.

"This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood," he said, Tuesday (11/10).

Retention Basin Construction in Tegal Alur is Expected to Overcome Inundation

According to him, this retention walls can accommodate up to 7,230 cubic meters water to prepare for water runoff from Semongol River or tidal flood.

"We have started the construction since September and targeted it to finish in December," he closed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1591 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1441 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1307 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye968 personDessy Suciati
  5. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye907 personDessy Suciati